SOLUTIONS FOR E-MOBILITY & FLEET OPERATIONS

Grid Independent EV Charging.
Operational in Days.

Grid Independent EV Charging.
Operational in Days.

Hydrogen power infrastructure for electric bus depots, fleet charging stations, and public charging networks without waiting years for grid upgrades.

Deploy multi-MW charging infrastructure independent of grid capacity constraints.
Zero diesel backup. Zero emissions. Predictable costs. Operational in weeks, not years.

Deploy multi-MW charging infrastructure independent of grid capacity constraints.
Zero diesel backup. Zero emissions. Predictable costs. Operational in weeks, not years.

AAppppllyy  ffoorr  PPiilloott  PPrrooggrraamm
SScchheedduullee  SSiittee  AAsssseessssmmeenntt

Grid Constraints Are Holding Back Electrification.

Electric mobility operators face a critical bottleneck: grid infrastructure cannot keep pace with EV deployment timelines.

Electric mobility operators face a critical bottleneck: grid infrastructure cannot keep pace with EV deployment timelines.

Design and specifications subject to change. The final VapourGen units are optimised for real world deployment; actual product appearance may vary slightly based on final engineering certifications and site-specific operational needs.

Slow grid. Tight mandates. Diesel irony.
Slow grid. Tight mandates. Diesel irony.
GRID CONNECTION DELAYS
GRID CONNECTION DELAYS

Utility upgrades create impossible timelines:

18-36 month wait times for multi-MW grid connections
₹50 lakh-5 crore upgrade costs (transformers, substations)
Uncertain approval timelines with local utilities
Geographic limitations (depots beyond grid reach)
Load rejection in congested urban zones

Utility upgrades create impossible timelines:

18-36 month wait times for multi-MW grid connections
₹50 lakh-5 crore upgrade costs (transformers, substations)
Uncertain approval timelines with local utilities
Geographic limitations (depots beyond grid reach)
Load rejection in congested urban zones

Remote towers rely on diesel backup with continuous operational challenges:

Fuel theft averaging 15-25% of consumption
Logistics costs for delivery to remote sites
Noise restrictions in urban and residential areas
Rising diesel costs (+40% since 2020)
ESG mandates requiring emission reductions

FLEET OPERATORS NEED IMMEDIATE SOLUTIONS
FLEET OPERATORS NEED IMMEDIATE SOLUTIONS

E-bus and fleet electrification cannot wait:

Government mandates requiring rapid EV adoption
Diesel phase-out timelines accelerating
Fleet replacement schedules not aligned with grid timelines
Competitive pressure to electrify operations
Financing dependent on deployment certainty

DIESEL BACKUP DEFEATS THE PURPOSE
DIESEL BACKUP DEFEATS THE PURPOSE

Current "solutions" undermine sustainability goals:

Diesel generators backing up EV charging (ironic)
High operational costs (₹100-140/liter for depot fuel)
Emissions at charging point (defeats net-zero claims)
Noise pollution incompatible with urban depots
ESG investors questioning diesel-backed electrification

THE BOTTOM LINE:

Grid dependency limits electrification speed. We eliminate that constraint entirely.

Power Your Project. Eliminate Diesel Complexity.

Power Your Project. Eliminate Diesel Complexity.

VapourGen and VapourGen-E deliver firm, grid independent power for electric vehicle charging from depot fast-charging to public DC networks.

HOW IT WORKS:

HOW IT WORKS:

For Urban Depot Charging (VapourGen)

AI-managed hydrogen delivery powers multi-MW charging infrastructure. No grid connection required. Deploy in weeks instead of years. Silent operation suitable for residential area depots.

For Urban Depot Charging (VapourGen)

AI-managed hydrogen delivery powers multi-MW charging infrastructure. No grid connection required. Deploy in weeks instead of years. Silent operation suitable for residential area depots.

For Urban Depot Charging (VapourGen)

AI-managed hydrogen delivery powers multi-MW charging infrastructure. No grid connection required. Deploy in weeks instead of years. Silent operation suitable for residential area depots.

For Remote/Highway Charging (VapourGen-E):

On-site hydrogen production from solar/wind enables charging stations beyond grid reach. Perfect for highway corridors, rural routes, or locations where grid connections are impossible.

For Remote/Highway Charging (VapourGen-E):

On-site hydrogen production from solar/wind enables charging stations beyond grid reach. Perfect for highway corridors, rural routes, or locations where grid connections are impossible.

For Remote/Highway Charging (VapourGen-E):

On-site hydrogen production from solar/wind enables charging stations beyond grid reach. Perfect for highway corridors, rural routes, or locations where grid connections are impossible.

WHAT MAKES IT DIFFERENT:

Deploy in 12-16 weeks
(vs 18-36 months for grid upgrades)
Zero grid upgrade costs
(₹50 lakh-5 crore savings)
Zero grid upgrade costs
(₹50 lakh-5 crore savings)
Scalable to multi-MW
(500kW-10MW+ charging capacity)
Zero emissions
(true net-zero charging infrastructure)

Zero grid upgrade costs
(₹50 lakh-5 crore savings)

Scalable to multi-MW
(500kW-10MW+ charging capacity)

Zero emissions
(true net-zero charging infrastructure)

Predictable costs
(no utility demand charges or time-of-use penalties)

Predictable costs
(no utility demand charges or time-of-use penalties)
WHAT MAKES IT DIFFERENT:
Deploy in 12-16 weeks
(vs 18-36 months for grid upgrades)
Zero grid upgrade costs
(₹50 lakh-5 crore savings)
Scalable to multi-MW
(500kW-10MW+ charging capacity)

Deploy in 12-16 weeks
(vs 18-36 months for grid upgrades)

Zero grid upgrade costs
(₹50 lakh-5 crore savings)

Scalable to multi-MW
(500kW-10MW+ charging capacity)

Zero emissions
(true net-zero charging infrastructure)

Predictable costs
(no utility demand charges or time-of-use penalties)

Predictable costs
(no utility demand charges or time-of-use penalties)

Grid-Independent. Emission-Free. Ready in Weeks

Grid-Independent. Emission-Free. Ready in Weeks

ELIMINATE GRID UPGRADE DELAYS
ELIMINATE GRID UPGRADE DELAYS
Deploy charging infrastructure on your timeline, not the utility's:

Operational in 12-16 weeks from contract to commissioning
No utility approval uncertainty
No transformer or substation upgrade requirements
No geographic limitations (deploy anywhere)
Avoid ₹50 lakh-5 crore grid connection costs

Deploy charging infrastructure on your timeline, not the utility's:

Operational in 12-16 weeks from contract to commissioning
No utility approval uncertainty
No transformer or substation upgrade requirements
No geographic limitations (deploy anywhere)
Avoid ₹50 lakh-5 crore grid connection costs

TRUE ZERO-EMISSION CHARGING

Deliver on sustainability promises without diesel backup:

Zero Scope 1 emissions at charging point
Zero Scope 2 emissions (no grid electricity)
Green hydrogen from renewable sources
Automatic carbon credit generation
ESG-compliant fleet electrification

PREDICTABLE ECONOMICS

Transparent energy pricing without utility complexity:

No demand charges (fixed utility cost elimination)
No time-of-use rate volatility
Predictable ₹/kWh cost structure
Protection from utility rate increases
Clear ROI modeling before deployment

TRUE ZERO-EMISSION CHARGING
Deliver on sustainability promises without diesel backup:

Zero Scope 1 emissions at charging point
Zero Scope 2 emissions (no grid electricity)
Green hydrogen from renewable sources
Automatic carbon credit generation
ESG-compliant fleet electrification
SCALABLE WITH FLEET GROWTH

Start with what you need, expand as fleet electrifies:

Modular 10-20kW increments
Add capacity without infrastructure redesign
No over-provisioning requirements
Future-proof for fleet expansion
Energy-as-a-Service eliminates stranded capital risk

PREDICTABLE ECONOMICS
Transparent energy pricing without utility complexity:

No demand charges (fixed utility cost elimination)
No time-of-use rate volatility
Predictable ₹/kWh cost structure
Protection from utility rate increases
Clear ROI modeling before deployment
SCALABLE WITH FLEET GROWTH
Start with what you need, expand as fleet electrifies:

Modular 10-20kW increments
Add capacity without infrastructure redesign
No over-provisioning requirements
Future-proof for fleet expansion
Energy-as-a-Service eliminates stranded capital risk

Every Fleet Size. Every Location. One Platform.

Every Fleet Size. Every Location. One Platform.

From an e-rickshaw depot to a city-wide charging network. Zero CAPEX, Zero grid dependency

From an e-rickshaw depot to a city-wide charging network. Zero CAPEX, Zero grid dependency

SMALL FLEET DEPOTS (100-500 kW)

SMALL FLEET DEPOTS (100-500 kW)
VapourGen for 10-50 vehicle overnight charging
Typical: 250kW for e-rickshaw or taxi depot
Fast deployment without grid upgrades
ROI: 24-36 months vs grid + backup

VapourGen for 10-50 vehicle overnight charging
Typical: 250kW for e-rickshaw or taxi depot
Fast deployment without grid upgrades
ROI: 24-36 months vs grid + backup

E-BUS DEPOTS (500 kW - 2 MW)

VapourGen or VapourGen-E
Typical: 1MW for 30-50 e-bus fleet
Simultaneous overnight charging capability
ROI: 36-48 months vs grid infrastructure

PUBLIC FAST CHARGING STATIONS (200 kW - 1 MW)

VapourGen for urban locations
Typical: 500kW multi-port DC fast charging
Grid-independent highway corridor deployment
Revenue generation: Direct charging fees

LARGE FLEET OPERATIONS (2-10 MW)

VapourGen-E with renewable integration
Typical: 5MW for logistics/delivery fleet hub
Complete energy independence
ROI: 48-60 months + carbon credit revenue

E-BUS DEPOTS (500 kW - 2 MW)

VapourGen or VapourGen-E
Typical: 1MW for 30-50 e-bus fleet
Simultaneous overnight charging capability
ROI: 36-48 months vs grid infrastructure

PUBLIC FAST CHARGING STATIONS (200 kW - 1 MW)

VapourGen for urban locations
Typical: 500kW multi-port DC fast charging
Grid-independent highway corridor deployment
Revenue generation: Direct charging fees

LARGE FLEET OPERATIONS (2-10 MW)

VapourGen-E with renewable integration
Typical: 5MW for logistics/delivery fleet hub
Complete energy independence
ROI: 48-60 months + carbon credit revenue

*All systems via Energy-as-a-Service with zero CAPEX

The Grid Is Costing You More Than You Think

The Grid Is Costing You More Than You Think

Grid upgrades, demand charges, diesel backup, missed deadlines. It adds up faster than most operators realise.

Grid upgrades, demand charges, diesel backup, missed deadlines. It adds up faster than most operators realise.

01 | GRID COST AVOIDANCE

01 | GRID COST AVOIDANCE

Eliminate grid upgrade costs (₹50 lakh-5 crore typical)
No transformer or substation installation
Avoid utility connection delays (18-36 months)
No ongoing demand charges (₹5-15 lakh/month for MW+ loads)
Eliminate time-of-use rate exposure

Eliminate grid upgrade costs (₹50 lakh-5 crore typical)
No transformer or substation installation
Avoid utility connection delays (18-36 months)
No ongoing demand charges (₹5-15 lakh/month for MW+ loads)
Eliminate time-of-use rate exposure

02 | OPERATIONAL ADVANTAGES

02 | OPERATIONAL ADVANTAGES

Deploy charging infrastructure in 12-16 weeks
Meet fleet electrification deadlines
Unlock locations beyond grid reach (highway corridors)
Avoid diesel backup costs and emissions
Silent operation for residential depot locations

Deploy charging infrastructure in 12-16 weeks
Meet fleet electrification deadlines
Unlock locations beyond grid reach (highway corridors)
Avoid diesel backup costs and emissions
Silent operation for residential depot locations

03 | ESG & REVENUE VALUE

03 | ESG & REVENUE VALUE

True net-zero charging (Scope 1 + 2 elimination)
Carbon credit generation (automatic tracking)
ESG investor compliance (authentic sustainability)
Public charging revenue potential (for station operators)
Brand differentiation (genuinely green charging)

True net-zero charging (Scope 1 + 2 elimination)
Carbon credit generation (automatic tracking)
ESG investor compliance (authentic sustainability)
Public charging revenue potential (for station operators)
Brand differentiation (genuinely green charging)

04 | TYPICAL ECONOMICS ESTIMATIONS

04 | TYPICAL ECONOMICS ESTIMATIONS

1250kW depot: ₹1.2-2 crore grid upgrade avoided + ₹60-90 lakh annual energy
1MW e-bus depot: ₹3-5 crore grid avoided + ₹2.5-4 crore annual energy
5MW fleet hub: ₹15-25 crore grid avoided + ₹12-20 crore annual energy

1250kW depot: ₹1.2-2 crore grid upgrade avoided + ₹60-90 lakh annual energy

1MW e-bus depot: ₹3-5 crore grid avoided + ₹2.5-4 crore annual energy

5MW fleet hub: ₹15-25 crore grid avoided + ₹12-20 crore annual energy

*Complete fleet-specific ROI modeling during site assessment

Powering India's Critical Infrastructure

Powering India's Critical Infrastructure

Powering India's Critical Infrastructure

Cosmos systems are deployed across sectors where downtime is not an option.

Cosmos systems are deployed across sectors where downtime is not an option.

Answers to Your Most Common Questions

Answers to Your Most Common Questions

Technical and Strategic Insights into the Cosmos Energy Stack.

Technical and Strategic Insights into the Cosmos Energy Stack.

FAQ

Questions & Answers

Have more questions? Don't hesitate to email us:

01

What's the difference between VapourGen and VapourGen-E?

02

How long do the systems last?

03

What happens if the system fails?

04

Do I need special permits for hydrogen storage?

FAQ

Questions & Answers

Have more questions? Don't hesitate to email us:

01

What's the difference between VapourGen and VapourGen-E?

02

How long do the systems last?

03

What happens if the system fails?

04

Do I need special permits for hydrogen storage?

FAQ

Questions & Answers

Have more questions? Don't hesitate to email us:

01

What's the difference between VapourGen and VapourGen-E?

02

How long do the systems last?

03

What happens if the system fails?

04

Do I need special permits for hydrogen storage?

Your Fleet Is Ready to Electrify. The Grid Isn't.

Grid delays are the single biggest obstacle to fleet electrification. Cosmos removes it entirely.
Tell us about your fleet and we will show you what deployment actually looks like.

Grid delays are the single biggest obstacle to fleet electrification. Cosmos removes it entirely.
Tell us about your fleet and we will show you what deployment actually looks like.

AAppppllyy  ffoorr  PPiilloott  PPrrooggrraamm
SScchheedduullee  CCllaassssiiffiieedd  DDiissccuussssiioonn